
Scope · Plumbing
New Construction Plumbing
Complete plumbing rough-in and finish for multi-story, multi-unit residential buildings, underground layout placed with the Topcon Positioning System, in-house excavation, and value engineering that keeps complex projects on schedule and inspection-ready.
01
Topcon laser-guided underground layout
We place underground pipe with the Topcon Positioning System for precise, efficient installs, minimizing costly moves after the concrete pour and keeping the trades behind us on schedule.


02
Built for multi-story multi-unit apartments
Condos, apartments, and multi-family residences, we review plans and fixture lists up front and value-engineer the system so it installs clean and passes inspection the first time.
Scope of work
What’s included
- Underground rough-in with Topcon laser-guided placement
- In-house excavation and site coordination
- Complete rough-in and finish plumbing for multi-story builds
- Fixture and water-line installation to spec
- Plan review, fixture-list takeoff, and value engineering
- Coordination with HVAC under one contractor to avoid field conflicts
Have plumbing plans to price?
Send us the drawings and fixture list, we’ll value-engineer a bid.